Byte BungalowByte Bungalow

← Stories

Half the Data Centers in the Headlines May Never Get Built. So Is the One Near You Even Real?

There's a data center coming to a field near me — at least that's what the announcement said. Then the town over got the same news. Then a few more. And I started to wonder if all of these were really happening, or if I was just reading the same hopeful press release on repeat. Turns out I was right to be suspicious: a huge share of the data centers making headlines will never turn into a single pour of concrete. Once you know what to look for, you can usually spot which ones are real.

A press release isn't a shovel

The first thing that broke my brain is that an announcement barely means anything. It's closer to getting in line than breaking ground. A developer files to reserve a grid connection, and that filing costs them almost nothing — no land, no signed customer, no financing needed just to raise their hand.

So the line fills up with everybody. Big names you'd expect, sure. But also land brokers, investment funds, and shell companies that don't own the dirt, don't have a tenant, and couldn't tell you what color the building's going to be. They grab a spot, bet that "powered land" will be worth something later, and wait.

Think of it like grabbing eight dinner reservations for the same Friday so you can pick later which one you actually want. Seven of those tables sit empty, but every restaurant already thinks it's booked solid. That's roughly what's happening to the power grid right now.

The number that made me stop trusting the map

Texas runs its own grid, and it keeps a public tally of everyone who's asked to plug in. Last time I checked, those requests added up to more than five times the most electricity the entire state has ever used at once — every home and factory and air conditioner in August, times five.

The amount actually built and running? Somewhere around one percent of it.

That's not just a Texas quirk. Grid analysts figure roughly two-thirds of the data center power being requested across the country will never materialize. One utility in Ohio got tired of guessing and simply asked developers to sign a real, long-term contract to pay for the power they were reserving. The moment there was actual money on the line, about two-thirds of the pipeline evaporated. The serious projects stayed. The reservations-of-convenience walked.

So how do you spot a real one?

Once I stopped trusting announcements, I started hunting for the boring paperwork underneath them, because the real ones leave a trail the fake ones don't.

A real project usually has a signed power deal, not just a spot in line. It's filed the engineering studies to prove the grid can actually feed it. There's a named tenant — an Amazon or a Microsoft or a Meta — with money committed, instead of a mystery LLC. And my favorite tell: somebody's ordered the actual engine. The big gas turbines that spin these generators are so backed up that if you placed an order today, you might not see it until around 2031. Nobody waits six years in line for a building they're not serious about.

The flip side is a project that's all press release and no plumbing, and those have started falling apart in a big way. Cancellations jumped several-fold in a single year, with something like a hundred billion dollars of projects blocked or stalled in one spring alone. Some of that is neighbors showing up to zoning meetings. A lot of it is the simple physics of power that was never really there.

The part nobody puts in the announcement

The canceled projects aren't even the interesting part. What got me is everything humming behind the ones that are real — the turbines on back-order, the substations, the water it takes to keep the servers cool, and the quiet question of whose electric bill covers all of it.

Once you start pulling that thread, it goes a lot further than one field near your house. That's the whole rabbit hole we chase on Byte Bungalow: the machines behind the grid and the people paying for them. If you want to see where this one leads, go watch the video and subscribe on YouTube. I'll keep doing the homework out loud.

Common questions

How can I tell if a data center announced near me will actually get built?
Look past the announcement for the paperwork. Real projects tend to have a signed long-term power contract, completed grid-connection studies, a named tenant with money committed, and equipment on order. If it's just a press release and a rezoning request with no utility deal behind it, treat it as a maybe, not a done deal.
Why would a company announce a data center it never intends to build?
Often it's less a lie than a bet. Getting in line for a grid connection is cheap and requires almost no commitment, so developers, land brokers, and investment funds file lots of requests to lock up "powered land" and see what pencils out. Most of those spots are placeholders, and a lot of them quietly disappear.
Will a data center near me raise my electric bill?
It can, and that's one of the loudest worries at local meetings. In some regions the cost of keeping enough power capacity on hand has spiked sharply, and those costs can spread across everyone's bills. Whether a specific project raises yours depends on how the deal is structured and who's on the hook for the new power lines and generation — which is exactly the fine print worth reading.
Do all these cancellations mean AI is a bubble?
Not by themselves. Demand for computing is still growing fast, and finished data centers are actually in short supply. What's collapsing is the gap between what got announced and what can physically be powered and permitted. You can have a very real boom and a giant pile of vaporware announcements at the same time.
Why does it matter that gas turbines are back-ordered?
Because a data center is useless without power, and a big share of new power is coming from natural gas turbines. Those are so backlogged that fresh orders may not arrive until around the end of the decade. It's become one of the clearest signals of who's serious — you don't wait years for an engine you don't plan to use.

Keep reading

Byte Bungalow

I do the homework out loud.

If this is the kind of thing you want checked against the documents instead of the hype, the video's above — and there's a new one every week.

Subscribe on YouTube →

By Byte Bungalow. Home power and home tech, checked against the documents instead of the hype. Independent commentary; not affiliated with any manufacturer, utility, or builder named here. Not professional electrical advice.